Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24C00474

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24C00474","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER (PHASE 3), BARANGAY MASALIPIT, SAN MIGUEL BULACAN","GAA 2024 OO-2","Completed",96499350.3,0,100,"Region III","Region III","ONE FRAME CONSTRUCTION INC. (57070) / TOPNOTCH CATALYST BUILDERS INC. (34061)","2024-07-15","2025-01-13",2024,"Regular Infra - GAA 2024 OO-2",15.165,121.0525,"301421000","301400000"]
SHA-256
5ec9ea05cbb170dd885ea62518b487a7e7045700e7dd35c45461f84550fccafb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.