Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24C00514

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24C00514","BASIC INFRASTRUCTURE PROGRAM -BIP- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES / FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MADLUM RIVER FSRR, BRGY. MASALIPIT, SAN MIGUEL, BULACAN (PHASE 1)","GAA 2024 SSP","Completed",98999702.9,0,100,"Region III","Region III","ONE FRAME CONSTRUCTION INC. (57070) / TOPNOTCH CATALYST BUILDERS INC. (34061)","2024-06-19","2025-01-13",2024,"Regular Infra - GAA 2024 SSP",15.1688,121.0524,"301421000","301400000"]
SHA-256
3ff7c9df859b299a36fc6cfaaac347378ee1f15bd905122c6fd807c2df549212

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.