Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CC0661

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CC0661","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TABANG RIVER AT BARANGAY SAN NICOLAS, BULAKAN, BULACAN","Flood Control and Drainage","On-Going",69951052.68,0,97.36,"Bulacan 1st DEO","Region III","PTM DEVELOPMENT CORP. (48504)","2025-02-28",null,2024,"Outside Infra - Unprogrammed Appropriations 2024",14.79768,120.86659,"301405000","301400000"]
SHA-256
9376a3f0e5e1d99d78a941fd5e326e8d6219b313bc7aec72b4a245a8d1eeded9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.