Project 24CD0003

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CD0003","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER AND ITS TRIBUTARIES, STA. 03+700 STA. 03+900 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN","Flood Control and Drainage","Completed",67549262.71,0,100,"Bulacan 2nd DEO","Region III","A.J. LAVA BUILDERS CORP. (FORMERLY: A.J. LAVA BUIL (22265)","2024-02-14","2024-11-04",2024,"Regular Infra - GAA 2024 OO-2",14.73842,120.92832,"301412000","301400000"]