Project 24CD0302
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CD0302","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. MARIA RIVER AND ITS TRIBUTARIES STA. 09+728 STA. 10+128, (SAN JOSE PATAG PULONG BUHANGIN SECTION), STA MARIA, BULACAN","Flood Control and Drainage","On-Going",115796992.43,0,27.79,"Bulacan 2nd DEO","Region III","NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)","2024-12-27",null,2024,"Outside Infra - Unprogrammed Appropriations 2024",14.84394,120.98958,"301423000","301400000"]
SHA-256
a0c69b11c97fc7a3ef5be1cef3b3b06aa1b31a307b9ba91e9555ff9b97bdca3dHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.