Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CE0220

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CE0220","CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG RIO CHICO RIVER, BRGY. CALEM, GUIMBA, NUEVA ECIJA","GAA 2024 OO-2","Completed",52544201.3,0,100,"Nueva Ecija 1st DEO","Region III","MIVICO 323 CONSTRUCTION CORP. (FORMERLY: MIVICO BUILDERS AND DEVELOPERS) (20551)","2024-04-08","2024-11-03",2024,"Regular Infra - GAA 2024 OO-2",15.63068,120.71162,"304911000","304900000"]
SHA-256
ec9476386c87d24b03e9972efd9f028d4b71a2e911796860daf3b754c5dfeb83

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.