Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CF0092

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CF0092","BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING ROAD DIKE ALONG PEÑARANDA RIVER, BARANGAYS SAN VICENTE - SAN LORENZO, GAPAN CIT","Flood Control and Drainage","Completed",70927178.54,0,100,"Nueva Ecija 2nd DEO","Region III","F-DEY CONSTRUCTION AND TRADING (38824) / JERRY R. SANTIAGO CONSTRUCTION CORP. (FORMERLY: JERRY SANTIAGO CONSTRUCTION) (18453)","2024-05-14","2024-10-09",2024,"Regular Infra - GAA 2024 SSP",15.31549,120.94969,"304908000","304900000"]
SHA-256
1c944c037b0125448dd3d29bb0641f671f126e8bfda562001c0c20b3ebb9f84e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.