Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CJ0167

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CJ0167","CONSTRUCTION OF MULTI-PURPOSE BUILDING (BUILDING 2) AT BARANGAY SAN PASCUAL, TARLAC CITY, TARLAC","Buildings and Facilities","Completed",6857465.99,0,100,"Tarlac DEO","Region III","B.K. SY TU CONSTRUCTION (12655)","2024-02-16","2024-08-13",2024,"Regular Infra - GAA 2024 SSP",15.50796,120.66846,"306916000","306900000"]
SHA-256
9aaa75ad53921fddae08310fb829a5edac313593bc627852b2bc3bac11c9cc3a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.