Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CK0045

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CK0045","REHABILITATION OF EXISTING DIKE ALONG RIO CHICO RIVER (MATAYUMTAYUM SECTION, RIGHT BANK), U/S OF RIO CHICO BRIDGE, PHASE 1, STA. 14+395.50 TO STA. 14+837.48, LA PAZ, TARLAC","GAA 2024 OO-2","Terminated",86714425.92,0,100,"Tarlac 2nd DEO","Region III","ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. (49128)","2024-05-07","2025-09-10",2024,"Regular Infra - GAA 2024 OO-2",15.51844,120.73514,"306907000","306900000"]
SHA-256
9729776546f13eda9c31489b6db40303255ab2749aa3398d5b2f67602b2607aa

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.