Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CN0166

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CN0166","CONSTRUCTION OF MULTI-PURPOSE BUILDING (PNP DIPACULAO SUB STATION), BRGY. DINADIAWAN, DIPACULAO, AURORA","Buildings and Facilities","Completed",4852042.83,0,100,"Aurora DEO","Region III","ULIRAN CONSTRUCTION SERVICES (46799)","2024-06-07","2025-04-25",2024,"Regular Infra - GAA 2024 SSP",16.07568,121.7685,"307706000","307700000"]
SHA-256
763bf1c79526a31cf22c391ff9018d89ab4002b873ab0b4aadc636a0fa7b66c7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.