Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24D00028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24D00028","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGOS RIVER, BARANGAY MINAHAN NORTE, GENERAL NAKAR, QUEZON","GAA 2024 OO-2","Completed",96496829.53,0,100,"Region IV-A","Region IV-A","JUNTEREAL INDUSTRIAL AND DEVELOPMENT CORPORATION (21357)","2024-02-28","2024-10-24",2024,"Regular Infra - GAA 2024 OO-2",14.75343,121.61576,"405617000","405600000"]
SHA-256
e85f05cd23086a151794b975c22c51796fd57a9a5a0e13cf207e941a81a1c66f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.