Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24DB0026

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24DB0026","ORG OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJ FLOODS-FLOOD MGMT PROG-CONST/ MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER, STA.0+854.80-STA.1+173.60(UPSTREAM R/S) AT BALAYAN,BATANGAS","Flood Control and Drainage","Completed",86850000,0,100,"Batangas 1st DEO","Region IV-A","FRANDEL CONSTRUCTION AND DEVELOPMENT CORP. (36116) / V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL (13487)","2024-02-14","2025-01-08",2024,"Regular Infra - GAA 2024 OO-2",13.94273,120.71741,"401003000","401000000"]
SHA-256
c2ba3aa16f820ff11f5a745f869979dc7cca1a186d009cd1a1bafd075146f944

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.