Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24DB0028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24DB0028","ORG OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJ FLOODS-FLOOD MGMT PROGM-CONST/ MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS-CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER,STA.1+173.60 - STA.1+492.40 (UPSTREAM R/S) AT BALAYAN,BATA","Flood Control and Drainage","Completed",86850000,0,100,"Batangas 1st DEO","Region IV-A","FRANDEL CONSTRUCTION AND DEVELOPMENT CORP. (36116) / V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL (13487)","2024-02-14","2025-03-16",2024,"Regular Infra - GAA 2024 OO-2",13.945,120.71638,"401003000","401000000"]
SHA-256
198806c61b5ed3dce5eff8c17218edfe45d5119c10a86628d8b7676c76d9310b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.