Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24E00176

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24E00176","FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF FLOOD MITIGATION STRUCTURE ALONG MAOYON RIVER, BRGY. MAOYON (LS), PTO. PRINCESA CITY, PALAWAN","GAA 2024 OO-2","On-Going",241247144.94,0,94.35,"MIMAROPA Region","MIMAROPA Region","MAMSAR CONSTRUCTION AND INDUSTRIAL CORPORATION (15885)","2024-03-02",null,2024,"Regular Infra - GAA 2024 OO-2",10.00473,118.89956,"1731500000","1705300000"]
SHA-256
f00038877bac0e4f9b6735d69c9f6ff410c1d017ae542b3451c4068dbc819bad

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.