Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24EH0035

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24EH0035","CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), PHASE 2, BARANGAY MALILICO, ODIONGAN, ROMBLON","GAA 2024 SSP","Completed",2970000,0,100,"Romblon DEO","MIMAROPA Region","R N V CONSTRUCTION (12570)","2024-06-14","2024-09-11",2024,"Regular Infra - GAA 2024 SSP",12.34895,121.97458,"1705909000","1705900000"]
SHA-256
ee4099c123a2df92a6a8b653b50e0f9188967c7d312ba861c7b2fc030b21e7a3

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.