Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24F00195

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24F00195","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BICOL RIVER FLOOD MITIGATION STR","GAA 2024 OO-2","Completed",148609457.69,0,100,"Region V","Region V","BICOL GOLDROCK CONSTRUCTION CORPORATION (32376) / PRIMARCH CONSTRUCTION OPC (55799)","2024-04-08","2025-04-19",2024,"Regular Infra - GAA 2024 OO-2",13.62003,123.14133,"501709000","501700000"]
SHA-256
4c3bd5544c5b933f89b033a08b96e9d86351f6d89a0b741654a4cd1246c1ac0c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.