Project 24F00498
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24F00498","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, RANGAS BRIDGE 2 (UPSTREAM), BARANGAY","Unprogrammed Appropriations 2024","On-Going",125449648.01,0,91.79,"Region V","Region V","ALRO CONSTRUCTION & DEVELOPMENT CORP. (18361)","2025-03-28",null,2024,"Outside Infra - Unprogrammed Appropriations 2024",13.6828,123.5196,"501733000","501700000"]
SHA-256
6e87d0b0aa7bb88e8d5de304b8771eeb225f4e99a9cfadd64419ff56954d051eHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.