Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24FB0057

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24FB0057","BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF RIVER DIKE ALONG BRGY. LIBOD, CAMALIG, ALBAY","GAA 2024 SSP","Completed",29698674.19,0,100,"Albay 2nd DEO","Region V","AJAN JEADA, INC. (FORMERLY: JEADA CONSTRUCTION) (17869)","2024-04-02","2024-08-13",2024,"Regular Infra - GAA 2024 SSP",13.17103,123.63641,"500502000","500500000"]
SHA-256
680c3ea030e62d2105cdd4e1aa022e4694a681f5e8c29afb683fd7f85b4fa962

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.