Project 24FB0148
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-24FB0148",
"title": "SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY BANADERO-BARANGAY BUDIAO,DARAGA,",
"sector": [
"Flood Control and Drainage"
],
"status": "implementation",
"publicAuthority": {
"name": "DPWH Albay 2nd DEO"
},
"period": {
"startDate": "2024-06-07"
},
"budget": {
"amount": {
"amount": 96498565.71,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
123.69614,
13.18235
]
}
}
],
"parties": [
{
"name": "RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "24FB0148",
"summary": {
"title": "SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF RIVER BANK PROTECTION WORKS AND DRAINAGE SYSTEM ALONG BARANGAY BANADERO-BARANGAY BUDIAO,DARAGA,",
"status": "active",
"contractValue": {
"amount": 96498565.71,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "On-Going",
"physicalProgressPercent": 80.92,
"fundingSource": "Regular Infra - GAA 2024 SSP",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "2748f72279d28b52e8a64dc47005f72755c94412773b27502b73243e3c4dfd78"
}
}