Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24FF0083

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24FF0083","BIP;FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST OF FLOOD MITIGATION STRUCTURE, BRGY. LERMA NAGA CITY CAMARINES SUR","GAA 2024 SSP","Completed",4891534.17,0,100,"Camarines Sur 3rd DEO","Region V","S & RV CONSTRUCTION & SUPPLY (19203)","2024-07-15","2025-02-21",2024,"Regular Infra - GAA 2024 SSP",13.62105,123.1881,"501724000","501700000"]
SHA-256
5150beed8e2feae57cced3208328f3b2f1d1fccdb89327a54ba9f31a5efa1908

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.