Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24GF0079

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24GF0079","CONSTRUCTION OF SIBALOM RIVER FLOOD CONTROL PROJECT, TIGBAUAN,   ILOILO","GAA 2024 OO-2","On-Going",37142633.12,0,90.24,"Iloilo 1st DEO","Region VI","A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)","2024-04-29",null,2024,"Regular Infra - GAA 2024 OO-2",10.70916,122.39213,"603045000","603000000"]
SHA-256
0c4c401f540de614b6ba14b90f91757e044f0b994190a2727e00b8ffc0aa795b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.