Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24GN0096

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24GN0096","CONSTRUCTION OF RAIN WATER COLLECTOR SYSTEM (RWCS)","Water Provision and Storage","Completed",2888763.48,0,100,"Negros Occidental 4th DEO","Negros Island Region","SILVERRIA CONSTRUCTION AND CONSTRUCTION SUPPLY COMPANY, OPC (49014)","2024-06-11","2024-09-22",2024,"Regular Infra - GAA 2024 SSP",10.50806,122.8806,"1804502000","1804500000"]
SHA-256
4c24b4bf0ccccc7e1b6db9a95e51ff73c9049909633af07a5b3a957dba792c83

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.