Project 24HA0161

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24HA0161","CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINANGE SYSTEM CONSTRUCTION IF VIGA FLOOD CONTROL STRUCTURE PHASE 2, ANTEQUERA, BOHOL","Flood Control and Drainage","On-Going",95995000,0,36.66,"Bohol 1st DEO","Region VII","SILVERWOLVES CONSTRUCTION CORPORATION (48466)","2025-05-15",null,2024,"Outside Infra - Unprogrammed Appropriations 2024",9.7567,123.93572,"701204000","701200000"]