Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24HB0008

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24HB0008","ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF GABAYAN RIVER FLOOD CONTROL, CANDIJAY, BOHOL STA.0+08","Flood Control and Drainage","Completed",139442021.84,0,100,"Bohol 3rd DEO","Region VII","FUENTABUILT CONSTRUCTION CORP. (36098) / M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION) (8215)","2024-06-11","2024-12-07",2024,"Regular Infra - GAA 2024 OO-2",9.84902,124.47201,"701211000","701200000"]
SHA-256
77ad6e0b57bb867b2e84107ab5659525e5768fd084a8afd184e562be03231205

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.