Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24HB0078

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24HB0078","ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - LOAY INTERIOR RD - K0190+191 - K0190+276, K0193+72","GAA 2024 OO-1","Completed",53496204.57,0,100,"Bohol 3rd DEO","Region VII","MOG CONSTRUCTION INC. (56306) / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)","2024-06-11","2026-08-05",2024,"Regular Infra - GAA 2024 OO-1",9.65035,124.0301,"701229000","701200000"]
SHA-256
6e3a92151ddb37739e1d2b0477a78bef66518da85a2befb13edc5612d5b8de69

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.