Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24HB0140

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24HB0140","CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL PROTECTION, GARCIA-HERNANDEZ, BOHOL STA.","Flood Control and Drainage","Completed",57877936,0,100,"Bohol 3rd DEO","Region VII","MOG CONSTRUCTION INC. (56306) / N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) (10470)","2024-05-28","2025-03-06",2024,"Regular Infra - GAA 2024 SSP",9.62238,124.31391,"701222000","701200000"]
SHA-256
3b6ca173eed253cb427237ca8df5e9ee749539571e4edbfbeed0b70696f321a1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.