Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24HB0166

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24HB0166","CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTOR SYSTEM  A.CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RCWS), LILA LEGISLATIVE BUILDING, LILA, BOHOLB.CONSTRUCTION OF RAI","Water Provision and Storage","Completed",2886479.98,0,100,"Bohol 3rd DEO","Region VII","JEGSTONE CONSTRUCTION (45922)","2024-08-02","2024-11-14",2024,"Regular Infra - GAA 2024 SSP",9.59587,124.0381,"701228000","701200000"]
SHA-256
b38f70405b2449f1662b9e6dc2ec96d428df210afe41519df18706b943ba30dd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.