Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24HC0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24HC0040","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, SALOG BRIDGE FLOOD CONTROL, G","Flood Control and Drainage","Completed",48403180,0,100,"Bohol 2nd DEO","Region VII","LEDA  CONSTRUCTION INCORPORATED (12229)","2024-03-07","2025-01-10",2024,"Regular Infra - GAA 2024 OO-2",10.13588,124.18532,"701226000","701200000"]
SHA-256
1dedbbc25bfe01300a9ba9d77e3353aeb8182e3157b860559df78a10eff5d1b0

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.