Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24HF0080

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24HF0080","CONSTRUCTION OF SHORELINE PROTECTION AND FLOOD CONTROL STRUCTURE IN BARANGAY CARMELO, TUBURAN, CEBU","Flood Control and Drainage","On-Going",96400000,0,0.24,"Cebu 3rd DEO","Region VII","QM BUILDERS (30743)","2024-08-27",null,2024,"Regular Infra - GAA 2024 SSP",10.7101,123.79533,"702252000","702200000"]
SHA-256
90ce998f5053d7f8dcb621780736a9c9cc394484da746d442ab8b864901a2b16

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.