Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24HG0087

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24HG0087","CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF MOMPELLER BRIDGE FLOOD CONTROL STRUCTURE AND SCOUR PROTECTION STRUCTURE, BARANGAY MOMP","GAA 2024 SSP","On-Going",29678888.88,0,91.34,"Cebu 2nd DEO","Region VII","POWER FRAME CONSTRUCTION & DEVELOPMENT CORP. (39837)","2024-06-17",null,2024,"Regular Infra - GAA 2024 SSP",9.98585,123.52828,"702205000","702200000"]
SHA-256
9c5f56083524c077e4b6377e0eeaa4e1e393bf56ce1cfa386ce4f3570383b575

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.