Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24J00018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24J00018","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TUGBUNGAN SECTION) PHASE III, ZAMBOANGA CITY","Flood Control and Drainage","On-Going",145394204.01,0,72.49,"Region IX","Region IX","PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. (15599)","2024-03-08",null,2024,"Regular Infra - GAA 2024 OO-2",6.92266,122.10629,"931700000","907300000"]
SHA-256
7cd91a9806250d2e7a7d2d7c074206f8e86a5f5ecd4f5fd8d473a531f977244a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.