Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24J00283

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24J00283","CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (TUGBUNGAN SECTION), ZAMBOANGA CITY, PACKAGE 3","Unprogrammed Appropriations 2024","On-Going",96200627.88,0,72.87,"Region IX","Region IX","PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. (15599)","2025-01-13",null,2024,"Outside Infra - Unprogrammed Appropriations 2024",null,null,null,null]
SHA-256
9f3f72b97b4d45cace36a86242986ceb7e039a024268f1058fd6b95de299ff5c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.