Project 24J00284
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24J00284","CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (TUGBUNGAN SECTION), ZAM-BOANGA CITY, PACKAGE 4","Unprogrammed Appropriations 2024","On-Going",96200102.35,0,73.27,"Region IX","Region IX","PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. (15599)","2025-01-13",null,2024,"Outside Infra - Unprogrammed Appropriations 2024",6.92513,122.1136,"931700000","907300000"]
SHA-256
9c83e58d658df9a42368319fcb9a665d7750bc07f53b1141a0d178a96fc4306eHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.