Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24JA0175

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24JA0175","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOALAN RIVER, BARANGAY BOALAN, PACKAGE 2, ZAMBOANGA CITY","Unprogrammed Appropriations 2024","On-Going",48218947.46,0,94.36,"Zamboanga City 2nd DEO","Region IX","LL CONSTRUCTION (34244) / TEDDIE CONSTRUCTION DEVELOPMENT, INC. (6313)","2025-03-12",null,2024,"Outside Infra - Unprogrammed Appropriations 2024",6.96133,122.11905,"931700000","907300000"]
SHA-256
e3922f72bc4868959c19876b7d411e95bfcdd6a1e37c0d37afa41ab7dc06669d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.