Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24K00196

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24K00196","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MANTICAO RIVER (DOWNSTREAM OF MANTICAO BRIDGE), MANTICAO, MISAMIS ORIENTAL","GAA 2024 SSP","On-Going",195920949,0,100,"Region X","Region X","FFJJ CONSTRUCTION (16712) / PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. (15599)","2024-05-03",null,2024,"Regular Infra - GAA 2024 SSP",8.40923,124.28696,"1004320000","1004300000"]
SHA-256
530cf348ecd5047ff635acb8fd59945b23a7b651623650162184faa9d49e799f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.