Project 24KB0035
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-24KB0035",
"title": "CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MARAMAG BRIDGE ALONG MARAMAG RIVER, MARAMAG, BUKIDNON",
"sector": [
"Flood Control: Construction - Dikes/Levees, Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)"
],
"status": "completed",
"publicAuthority": {
"name": "DPWH Bukidnon 2nd DEO"
},
"period": {
"startDate": "2024-02-16",
"endDate": "2025-01-25"
},
"budget": {
"amount": {
"amount": 91675000,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
124.98264,
7.77538
]
}
}
],
"parties": [
{
"name": "JT GAMOLO CONSTRUCTION, INCORPORATION (FORMERLY:J.T. GAMOLO CONSTRUCTION) (15759) / MAFIL BUILDERS, INC.",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "24KB0035",
"summary": {
"title": "CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MARAMAG BRIDGE ALONG MARAMAG RIVER, MARAMAG, BUKIDNON",
"status": "closed",
"contractValue": {
"amount": 91675000,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "Completed",
"physicalProgressPercent": 100,
"fundingSource": "Regular Infra - Flood Control: Construction - Dikes/Levees, Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "59f0f561d8b4bd517e708f71e7afe1f24e38cb9c4c14208f1d214016f3807a45"
}
}