Project 24KB0051
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-24KB0051",
"title": "CONSTRUCTION OF REVETMENT, UPSTREAM OF MUSUAN BRIDGE ALONG TAGANIBONG CREEK, MARAMAG, BUKIDNON PACKAGE 3",
"sector": [
"Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)"
],
"status": "implementation",
"publicAuthority": {
"name": "DPWH Bukidnon 2nd DEO"
},
"period": {
"startDate": "2024-03-12"
},
"budget": {
"amount": {
"amount": 57868945.68,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
125.04824,
7.86795
]
}
}
],
"parties": [
{
"name": "CAGALAWAN ENTERPRISES (38019) / PHILIPPIANS CDO CONSTRUCTION CORPORATION",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "24KB0051",
"summary": {
"title": "CONSTRUCTION OF REVETMENT, UPSTREAM OF MUSUAN BRIDGE ALONG TAGANIBONG CREEK, MARAMAG, BUKIDNON PACKAGE 3",
"status": "active",
"contractValue": {
"amount": 57868945.68,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "On-Going",
"physicalProgressPercent": 100,
"fundingSource": "Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "628377718658ac833f7bb69fde78c031b6ffa9ea08b9c0af7535459f65aeeb14"
}
}