Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24ME0080

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24ME0080","CONSTRUCTION OF LUN MASLA RIVER (UPSTREAM) FLOOD CONTROL, MALAPATAN, SARANGANI PROVINCE","Flood Control and Drainage","Completed",96497759.33,0,100,"Sarangani DEO","Region XII","J.G. ORANZA CONSTRUCTION (33370)","2024-04-05","2024-11-20",2024,"Regular Infra - GAA 2024 SSP",5.98022,125.43751,"1208006000","1208000000"]
SHA-256
51c105d06e94b685af742926404e2e8f6aadfc48a9df377bdf239b07c4a29c46

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.