Project 24OA0036

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24OA0036","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MUZON RIVERWALL (PHASE 3), BRGY. MUZON, MALABON CITY","Flood Control and Drainage","Completed",49000000,0,100,"Malabon-Navotas DEO","National Capital Region","M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS (31684)","2024-02-12","2024-12-06",2024,"Regular Infra - GAA 2024 OO-2",14.67378,120.94796,"1380400000","1307500000"]