Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24OE0174

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24OE0174","CONSTRUCTION OF RETARDING BASIN AT ESTERO DE BINONDO, MANILA CITY (PHASE III)","Flood Control and Drainage","Completed",96498827.7,0,100,"North Manila DEO","National Capital Region","NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)","2024-02-14","2025-03-14",2024,"Regular Infra - GAA 2024 SSP",14.60143,120.97207,"1380600000","1303900000"]
SHA-256
2eba78baa3c2988c5348f43c9a9f6eb6623ed5af32dbf085119707e4500c98ec

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.