Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24PA0191

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24PA0191","CONSTRUCTION OF MALIBCONG FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, MALIBCONG, ABRA","Unprogrammed Appropriations 2024","On-Going",138791128.35,0,89.92,"Abra DEO","Cordillera Administrative Region","MG SAMIDAN CONSTRUCTION (33234)","2025-01-14",null,2024,"Outside Infra - Unprogrammed Appropriations 2024",17.62542,121.04274,"1400115000","1400100000"]
SHA-256
93d9584cecbb91676c5e53b0b0b7c0bdc668fd9cf2391c4f32771dff439ac1a2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.