Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25A00416

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25A00416","CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF BUCONG-BAGAR-VILLARICA FLOOD CONTROL, CANDON CITY, ILOCOS SUR","GAA 2025 OO-2","On-Going",18720963.18,0,100,"Region I","Region I","FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP. (11645)","2025-04-07",null,2025,"Regular Infra - GAA 2025 OO-2",17.21753,120.44809,"102906000","102900000"]
SHA-256
48584d6abe6c4ee758db0bb986f89d42c756c95ca490403f31f5eed3f0dc4e02

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.