Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25A00421

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25A00421","CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF STA. MARIA FLOOD CONTROL, STA. MARIA, ILOCOS SUR","GAA 2025 OO-2","On-Going",28078414.91,0,88.02,"Region I","Region I","MBB CONSTRUCTION AND SUPPLY (FORMERLY: MBB CONSTRUCTION) (11363)","2025-04-07",null,2025,"Regular Infra - GAA 2025 OO-2",17.38803,120.48049,"102926000","102900000"]
SHA-256
029b4b64355bbd68fe1c816817746b5085b8b15b1d68e75f20ab1912656b6c44

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.