Project 25AA0099
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25AA0099","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SABO DAM, BARANGAY CABAROAN, PIDDIG, ILOCOS NORTE, PHASE 2","Flood Control and Drainage","On-Going",4737501.88,0,0,"Ilocos Norte 1st DEO","Region I","SKYLINE CONSTRUCTION, EQUIPMENT AND DEVELOPMENT CORPORATION(FORMERLY: EDDIE G. GUILLEN BUILDERS INC. (14174)","2025-04-08",null,2025,"Regular Infra - GAA 2025 OO-2",18.16879,120.7168,"102818000","102800000"]
SHA-256
0af42249a43db8cf78fdc1a1f766645a8841fec9588400a0af96b9b260f03057Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.