Project 25AA0100
DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25AA0100","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SABO DAM, BARANGAY ESTANCIA, PIDDIG, ILOCOS NORTE, PHASE 2","Flood Control and Drainage","On-Going",4734955.49,0,0,"Ilocos Norte 1st DEO","Region I","SKYLINE CONSTRUCTION, EQUIPMENT AND DEVELOPMENT CORPORATION(FORMERLY: EDDIE G. GUILLEN BUILDERS INC. (14174)","2025-04-08",null,2025,"Regular Infra - GAA 2025 OO-2",18.16774,120.78228,"102818000","102800000"]
SHA-256
6100fc4e72a3250efeec9f583cbb67ecb3160e74dd51f58de262d7894499490cHash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.