Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25AB0002

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25AB0002","CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF GROUNDSILL AND PROTECTION WALL AT LABUGAON RIS, SOLSONA, ILOCOS NORTE","Flood Control and Drainage","On-Going",14112001.16,0,79.41,"Ilocos Norte 2nd DEO","Region I","VCD CONSTRUCTION (13949)","2025-02-21",null,2025,"Regular Infra - GAA 2025 OO-2",18.10969,120.83549,"102822000","102800000"]
SHA-256
2f91699729b2cccb67245764a1bc7903bf69f85904350fb0db7e09d4139feda2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.