Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25AB0005

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25AB0005","CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG QUIAOIT RIVER, DOWNSTREAM, PHASE 2, ALWINALDO BRIDGE, BARANGAY MAIPALIG, BATAC CITY, ILOCOS NORTE","GAA 2025 OO-2","On-Going",141855000,0,72.22,"Ilocos Norte 2nd DEO","Region I","MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY (38288)","2025-02-21",null,2025,"Regular Infra - GAA 2025 OO-2",17.98508,120.5789,"102805000","102800000"]
SHA-256
3007eb809cfa049976e9ad21fd186da7832306d22d51e38102d1c46400c99d61

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.