Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25AD0062

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25AD0062","SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SALVADOR-LANGLANGCA, CITY OF CANDON, ILOCOS SUR","GAA 2025 SSP","Completed",48194184.43,0,100,"Ilocos Sur 2nd DEO","Region I","NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY (37062)","2025-05-23","2026-09-01",2025,"Regular Infra - GAA 2025 SSP",17.23316,120.47486,"102902000","102900000"]
SHA-256
0ad6d2a04e049e40e6a3394275be0c811fc12c1cfa908cb2a71cd5ea470f82bd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.