Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25AF0044

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25AF0044","CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONST. OF FLOOD CONTROL ALONG UPSTREAM OF LOSSOC BRIDGE, BAUANG, LA UNION","Flood Control and Drainage","Completed",96493767.97,0,100,"La Union 2nd DEO","Region I","JWU CONSTRUCTION AND SUPPLY (48659)","2025-02-18","2025-07-18",2025,"Regular Infra - GAA 2025 OO-2",16.50167,120.32783,"103307000","103300000"]
SHA-256
fe0a012e080e822b7875cb4c89292d1362f0684f14fb13710bd877b43a718596

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.