Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25AI0062

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25AI0062","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CABULANDAYAN RIVER, NATIVIDAD, PANGASINAN (PACKAGE 1)","GAA 2025 OO-2","On-Going",95231037.93,0,12.17,"Pangasinan 3rd DEO","Region I","HIGH ROCK CONSTRUCTION AND SUPPLIES INCORPORATED (50835) / VILLAR GENERAL CONSTRUCTION AND SUPPLIES (22540)","2025-03-13",null,2025,"Regular Infra - GAA 2025 OO-2",16.05047,120.77915,"105529000","105500000"]
SHA-256
96c652a4b59843f8294f27e75265536ad2db40de80bda7650f59156da0b599dd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.